Wuxi Times City Phase 3 second section three push diamond mesh high definition high transparency screen installation landing case
Wuxi Times City Phase 3 | Two-stage three-push diamond mesh high definition and high transparency screen window installation landing case
Panoramic photo of the completion of the screen window of Times City Phase 3
First, the project overview: Times City Phase 3 owners' screen window renovation needs
Real pictures of original windows and old screen windows on site

This case landed in the 3rd phase of Times City. The owner's house is a high-rise residence, and the windows are aluminum outer windows with broken bridges. The owner originally had old-fashioned sliding screen windows in his home, which have been used for many years. The disadvantages are prominent: the mesh is thick and black, blocking daylight, and the field of view is depressed when looking outside; the sliding and pulling of the screen windows is easy to get stuck, the closing gap is large, and mosquitoes and catkins are easy to enter the room; there are young children at home, and the old screen windows lack reliable protective locks, which poses a potential safety hazard for falling windows. At the same time, the handle position of the outer window opening is special, and it is easy to interfere with the handle when the ordinary screen window is pushed and pulled
After online comparison and neighbor recommendation, the owner finally chose us to customize the two-stage three-push diamond mesh high definition high-transparency screen window. The core appeal: transparent vision, smooth push-pull, mosquito-proof and dustproof, child safety protection, and convenient for later cleaning. We arranged for the master to come to the site for on-site investigation, combined with the characteristics of Times City Phase 3 apartment window type, and issued an exclusive customized plan.
Second, door-to-door survey, tailor-made design of two-stage three-push screen window scheme
The master measures the window frame and checks the scene map of the handle position.

After receiving the order, the technician came to the door on time to survey, recording the size of each window, the structure of the window frame, the position of the handle of the outer opening window, and the wall gap one by one. The core advantage of the two-stage three-push structure is that it is specially adapted to the outer opening window. The upper and lower sections are fixed, and the middle three are movable push and pull. It skillfully avoids the window handle and will not interfere with the normal opening of the window.
Combined with the high-rise wind pressure environment, the plan determines the use of 304 high definition high-transparency diamond mesh, thickened 6063-T5 aluminum alloy frame, EPDM EPDM sealing strip, silent wear-resistant pulley and child safety limit lock. The color of the profile is the same as the original broken bridge aluminum window frame, keeping the appearance and unity of the facade. After the drawings are confirmed, they are sent to the factory for numerical control processing to ensure dimensional accuracy.
Third, factory standardized production, strict control of screen window process quality
Workshop profile blanking, mesh pressing quality inspection details

After the drawings are confirmed to be correct, they enter the factory for production. The frame adopts the original aluminum profile integrated bending and seamless corner forming process, and the four corners are firm and not easy to loosen; the high definition and high transparency mesh is finely pressed, and the mesh surface is flat, not drum mesh, not loose silk; the pulley, sealing tape, and safety lock are synchronously assembled.
Each set of screens goes through a quality inspection process before leaving the factory, checking the mesh surface, frame square degree, push-pull smoothness, and lock function. Defective products are directly reworked to eliminate common problems such as cards, leaks, and deformation, and ensure that all screens sent to the Times City Phase 3 construction site meet standards.
IV. On-site standardized installation and fine debugging of screen window performance
Installation master fixed window frame, debugging fan body real picture
When the goods are delivered to the owner's home of Times City Phase 3, the installer first cleans up the sundries of the window frame and protects the original doors and windows to avoid scratching the paint surface. Fix the outer frame according to the positioning marks to ensure horizontal and vertical, and then assemble the movable fan in turn, adjust the tightness of the pulley, and adjust the fit of the rubber strip to ensure that the surrounding seals are tight after the screen window is closed.
Focus on debugging the two-stage three-push linkage structure, the three-fan push-pull switch is smooth and silent, no card, no impact abnormal sound; the limit device is debugged in place to prevent the fan body from derailment; the child safety lock is repeatedly tested, and the lock is stable, and the child cannot open it by himself. Clean up the garbage on site at the end of construction to ensure that the site is cleared after work.
5. Owner acceptance, real use experience of the second and third push screen windows
After installing the screen window, the indoor perspective effect is actually taken.
All debugging is completed, and the owner is invited to accept it on site. The most intuitive feeling of the owner's feedback is that the field of vision is transparent. Compared with the previous dark thick net, the high definition high-transparency net has good light transmittance, open line of sight, and no sense of depression. The push-pull feel is light, and the switch window will not conflict with the handle, which solves the biggest trouble before.
After the safety lock is locked, the movable fan cannot be pushed open, effectively preventing children from opening the window and climbing; the screen window supports tool-free quick dismantling, and the catkins and dust can be cleaned later. It can be directly removed and rinsed, and the maintenance is simple. The seal is in place, it is difficult for mosquitoes to enter, and the mesh surface is stable and does not shake under the high-rise strong wind. The owner is very satisfied with the product workmanship and installation services.
VI. Case summary: Reference value for screen window renovation in Times City Phase 3
Close-up renderings of finished screen windows
The case of Times City Phase 3 is a typical sample of the upgrade of high-rise external window screens. The two-stage three-push diamond mesh high definition and high-transparency screen windows aim to solve the pain points such as interference of external window handles, poor field of vision, weak protection, and difficulty in cleaning. At the same time, it takes into account the multiple functions of lighting, ventilation, mosquito prevention, and safety.
We provide one-stop screen customization services from survey, scheme design, factory production, door-to-door installation to after-sales service, which is suitable for new house decoration and old screen replacement in the same community and surrounding buildings in Times City. If you have screen customization needs, you can make an appointment for on-site survey.
